Location: 0 Wildwood Street, Dorchester, Boston, MA 02126Project Type: New Construction – 3-Story, 3-Unit Multifamily (Triple Decker)Scope: MEP Engineering | Fire Sprinkler Design | Fire Alarm System Design | Energy ComplianceProject Area: ~4,000 sq. ft. | 4 Bedrooms | 3 Parking SpacesCompletion Stage: Construction Documents – 2025Code Compliance: NFPA 13D, 780 CMR (10th Ed.), MA
Read More
Location: 22512 SR 410 E, Bonney Lake, WA 98391Scope: MEP Engineering, Washington State Energy Compliance ReportProject Type: Winery | New Construction | Hospitality & IndustrialClient: Oleg Seletskyy | Architect: ORC-A Design Building Area: ~16,000 sq. ft. Project Overview Seletskyy Winery is a newly constructed 16,000-square-foot facility in Bonney Lake, Washington, featuring a wine storage warehouse,
Read More
Project Name: Moss Creek Clubhouse RenovationLocation: 100 Devils Elbow Ln, Hilton Head Island, SCService Provided: Fire Protection Engineering & Fire Sprinkler System DesignClient Objective: Redesign and upgrade an existing fire suppression system with leakage issues and manage contractor bidding Overview The Moss Creek Clubhouse Renovation project in Hilton Head Island, SC presented a critical fire
Read More
MEP Engineering | Structural Engineering | 24 Compliance Project Overview Located at 12205–12249 14th Street in Yucaipa, California, Crafton Suites Apartments is a new 153-unit multifamily residential development. Spread across five parcels totaling over 5 acres, the project features five 3-story buildings, each designed with a mix of one-, two-, and three-bedroom units. The development
Read More
Project Overview Client: Advanced Construction LLC (advconstruct.com)Location: 338, 344 & 348 Main St, Niantic, ConnecticutProject Type: Mixed-Use Development (Residential + Commercial) InnoDez Scope: Mechanical, Electrical & Plumbing (MEP) Design and Engineering Energy Code Compliance (IECC/ASHRAE) Documentation and CertificationProject Duration: 2 Weeks This mixed-use redevelopment in historic Niantic, CT involved modernizing three adjoining Main Street parcels
Read More
MEP & Fire Sprinkler Engineering for Multi-Family Development in Groton, CT Project Overview Project Name: Multi-Family Residential DevelopmentLocation: 334 Long Hill Road, Groton, ConnecticutProject Type: Multi-Family Residential with Podium Parking InnoDez Engineering Services: Mechanical, Electrical & Plumbing (MEP) Design Energy Code Compliance & Analysis Fire Sprinkler System Design Project Summary InnoDez Engineering provided full MEP,
Read More
Project Overview Project Name: Macy’s Countryside Furniture (Renovation)Location: 26256 US Hwy 19 N, Clearwater, FL 33761Project Type: Retail / Furniture Showroom Renovation InnoDez Engineering Services: Mechanical & Electrical (ME) Engineering Fire Fighting / Fire Protection System Design Existing Conditions Site Investigation & Documentation Project Summary InnoDez Engineering provided Mechanical, Electrical, and Fire Fighting system design
Read More
Project Overview Project Name: Fire Station 9Location: 132 Loto Street, Eagle Point, ORProject Type: Municipal / Public Safety Facility InnoDez Engineering Services: Mechanical, Electrical & Plumbing (MEP) Design Energy Compliance & Analysis Fire Sprinkler System Design Fire Alarm System Design Project Summary InnoDez Engineering provided full MEP, Energy, Fire Sprinkler, and Fire Alarm system design
Read More
Location: 525 B Street, San Diego, CABuilding: 22-Story High-RiseScope: MEP Investigation & Existing Conditions Assessment InnoDez Engineering was engaged to perform a comprehensive Mechanical, Plumbing, and Electrical (MEP) site assessment for a 22-story high-rise building at 525 B Street in downtown San Diego, as part of a proposed office-to-hotel conversion. The proposed program for the
Read More
Location: 17904 Magnolia Street, Fountain Valley, CA 92708Building Area: Ground Floor: ±17,830 SF Mezzanine: ±1,500 SF Services Provided by InnoDez: Full MEP Engineering Design Title 24 Energy Compliance (California) Project Type: Commercial / Indoor Sports FacilityDelivery Timeline: Less than 2 weeks Project Summary InnoDez Engineering successfully delivered complete Mechanical, Electrical, Plumbing (MEP) design and California
Read More
Location: 3661 Camino Del Rio South, San Diego, CA 92108 Client: Private Developer Services Provided: Mechanical, Electrical & Plumbing (MEP) Engineering and Title 24 Energy Calulations Delivery Time: Less than 2 weeks Project Summary InnoDez Engineering provided full MEP engineering services in under two weeks for a new Padel Sports Club development in San Diego,
Read More
Project Overview Project Name: 210 8th Street – Mixed-Use DevelopmentLocation: Glenwood Springs, ColoradoBuilding Type: 4-Story + Basement Mixed-Use BuildingServices Provided: MEP Engineering & Structural EngineeringProject Status: Active – Kick-Off Completed Client Challenge The development team for the 210 8th Street Mixed-Use project in Glenwood Springs, CO required an experienced engineering consultant capable of delivering integrated
Read More